Trades / CORE Site Concrete

Curb by the foot. Areas where the sheet fills them in.

The limit first: CORE measures an area only where the sheet draws it as a solid fill. Paving and walks drawn as a line hatch come in as lines today, so you get their lengths, not their square footage. Curb, gutter and footing lines are measured by the foot.

Illustration: a site plan sheet, and above it a block of ground carrying a concrete slab with a yellow edge beside a strip of pavers
Illustration

In the app

See it done on a sample sheet

Recorded in the app on a sample sheet. No sound.

What you get

What it does, and what you check

  • Know the limit

    Paving and walks drawn as a line hatch come in as lines today, not as areas. You get their lengths; the area has to be worked out by hand, and a tool to draw it in CORE is not built yet.

  • Curb and footings by the foot

    Curb, gutter and footing lines carry their length on the same list as the pipe.

  • Areas where the sheet allows

    Regions drawn as a solid fill, such as a slab or a building footprint, are found and measured, with the length of their edge.

  • Your prices

    Rows are priced from your own unit prices once you add them.

What is in it

What is live, and what is next

We mark what is not in the product yet, so you know what you are buying today.

FeatureWhat you getStatus
LengthsCurb, gutter and footings.In the product
AreasRegions drawn as a solid fill only. Line hatches are read as lines.In the product
Hand tools Coming soonDraw an area yourself, for hatched paving or an unusual plan.Not yet

Every number shows its source, so you can check it against the sheet. Nothing is priced until you add it to the takeoff.

The rest of the civil set, on the same list

See it on your own plans.

Book a demo, or request access and try it on a job you already took off. 30-day money-back guarantee.

Book a demo on your plans